GEMCOM MINEX TUTORIAL PDF

Open Pit Scheduling Module In the world of open pit mining, schedules can make the difference between profit and loss. The Gemcom Minex™. Gemcom Minex Tutorial | added by users. David Guetta Sunshine ( David Guetta & Avicii).mp3. Rebel telugu movie free download. Gemcom Software International publishes this documentation for the sole use of Minex licences. Without written permission, you may not sell, reproduce, store in .

Author: Mishicage Jutaxe
Country: Belize
Language: English (Spanish)
Genre: Personal Growth
Published (Last): 5 July 2012
Pages: 412
PDF File Size: 4.37 Mb
ePub File Size: 13.83 Mb
ISBN: 408-2-30250-823-1
Downloads: 63835
Price: Free* [*Free Regsitration Required]
Uploader: Vuhn

Objectives By working through this document, you should be able to: Alternatively, if you have survey data of the topography, you can triangulate the survey strings in the geometry file. How to start Minex and work with a project. If you need to move an entire parameters file to minec computer, you can copy and paste the parameters file in Windows Explorer, or in the Filesystems tab.

Open Pit Scheduling supports an unlimited number of what-if scenarios on different strategies for ore extraction, mjnex utilisation, and dumping. Next, save the plan. By doing so, you enable Minex to display geometry with negligible loss of accuracy. This time, you will use a menu command so that you can easily specify the colour of the grid.

You can create one from the topography grid. When you want to select existing strings, edit them and create new strings, you work in the Graphics window see Digitizing. The files currently open in Minex.

From the shortcut menu, select Move, and then Drag XY. You have now created the mount. You can save the section by archiving mined or by doing a graphics capture.

  ARBAN METHOD FOR TUBA PDF

Structure of the Geometry File A geometry file contains many different types ninex data, stored in a hierarchy. If you have any difficulties or questions while working through this manual, please contact your local Gemcom office.

Now draft on the mount. GM3 and click Open. Create a Section Showing a Seam Cross-section In the Graphics window, click on the left side of the pit, and then the right side of the pit, to create the section line.

Gemcom minex open_pitscheduling_ds

You can use the same technique to display or hide other toolbars. You need to have a geometry file open so that you have a place where you can store the imported survey data. List box Menu A set of options or actions that you can perform. Click Cancel on the Edit Triangle dialogue box.

Enter a grid interval tutorixl X: Rectangular box in which you can type text. Indicates the desired version of Java. A graphical button that tutofial can click to initiate an action. Dragging some types of file such as grids and triangles into the Graphics window is equivalent to clicking Display. You use the Visualization tab for advanced tasks that are beyond the scope of this tutorial. However, this icon is unavailable and when you click it nothing happens. The Positive volume is the total volume that is below the tops triangle but above the pit triangle.

Set Minex to Use a Local Licence 1. Enter a name and click Ok.

GEOVIA Minex™

Select Local and click Ok. You can also type a valid value in the box. The following minsx shows an example of some geometry data, specifically water bodies and contours. What are the coordinates of a point?

  8257 DMA CONTROLLER INTERFACING WITH 8086 PDF

Expand the tree so that it shows the Local Origin row. Drag from the lower left corner of the graphics window to the upper right corner so that the box you create includes all the boreholes. GM3 and click Display to show the data in the Graphics window. If you intend to print the seam cross-section, you will use much less ink if you have a white background. Any type of box containing a list of items, in table format, that you can select.

Ground Level, 93 The Terrace Documents. Click in the lower left corner of the geometry and then click in the upper right corner. Set the Mimex Directory 1.

Gemcom minex open_pitscheduling_ds

By clicking Clear Graphics. Run predefined and customised reports. Select the Local Origin row and enter the same coordinates that you noted from the Output window when you ran a query. Status Bar Kinex status bar displays interaction instructions, system status messages, questions and warnings when you are using Minex.

Often the most efficient way to create a string is to switch between the digitizing options while you gsmcom creating the string. Right-click the Plan — Create tab and click Save Parameters. About This Manual This manual has been designed to provide a practical guide to the many uses of the software.